  • Permanent Sacrificial Anode Cathodic Protection System for Inter Refinery Terminals (IRT) pipelines:

  • Design, Supply, Installation and Commissioning by CCPL
    Main Contractor: Integral Services Company, Kuwait (ISCO)
    Owner of the project: Kuwait National Petroleum Company (KNPC)

  • Impressed Current Cathodic Protection System for New 20" Diameter Main Gas Oil Pipeline from MAA Refinery to Subiyah Power Station:

  • Supply, Installation and Commissioning by CCPL
    Main Contractor: Metalex Construction Trading Company, Turkey
    Owner of the project: Kuwait Oil Company (KOC)

  • Permanent Sacrificial Anode Cathodic Protection System for 48" Diameter Ductile Iron Distillate Water Pipeline from Shuaiba Distillation Plant to New Mina Abdulla Water Distribution Complex:

  • Design, Supply, Installation and Commissioning by CCPL
    Main Contractor: Kuwait Arab Contractors, Egypt
    Owner of the project: Ministry of Electricity & Water (MEW)

  • Impressed Current Cathodic Protection System for Port of Liverpool - Gladston Mitre Gate 1:

  • Design, Supply, Installation and Commissioning by CCPL
    Installation by Fabricom Suezt
    Main Contractor: Nuttall John Martin - BAM Nuttall
    Owner of the project: Peel Ports - Mersey Docks & Harbour Company

  • Impressed Current Cathodic Protection System for Port of Liverpool - Gladston Mitre Gate 2:

  • Design, Supply, Installation and Commissioning by CCPL
    Installation by Fabricom Suezt
    Main Contractor: Nuttall John Martin - BAM Nuttall
    Owner of the project: Peel Ports - Mersey Docks & Harbour Company

  • Impressed Current Cathodic Protection System for Port of Liverpool - Langton Caisson Gate 1:

  • Design, Supply, Installation and Commissioning by CCPL
    Installation by Fabricom Suezt
    Main Contractor: Nuttall John Martin - BAM Nuttall
    Owner of the project: Peel Ports - Mersey Docks & Harbour Company

  • Permanent Sacrificial Anode Cathodic Protection System for Liverpool Cruise Liner Facility:

  • Design, Supply, Installation and Commissioning by CCPL
    Installation by Balfour Beatty Civil Engineering
    Main Contractor: Balfour Beatty Civil Engineering
    Owner of the project: Liverpool City Council And Sticco